Asphalt resurfacing works at Drawn Fraser Ave from Australia Ave to Edwin Flack for the following dates to occur between 8pm – 5am from the 29 April – 20 May 2021.
Asphalt Works will include
29 April – 30 April: Socket Removal Works
3 May – 11 May: Asphalt Resurfacing
16 May – 18 May: Socket Reinstatement Works
18 May – 20 May: Line Marking Reinstatement
What to expect
Traffic Management
Noise due to Asphalt works
Traffic interruption
Traffic control and access throughout the period of the works
Entry to adjacent properties will be maintained at all times.
Temporary traffic control and directional signage will be always in place to ensure safe movement around the work area.
Traffic controllers will be positioned to ensure the safe and efficient flow of pedestrians and traffic and entry to any adjacent properties obstructed by the road closure.
Hours of work
8pm – 5am (9 hours)
Location of work
Drawn Fraser Ave from Australia Ave to Showground Rd
Drawn Fraser Ave from Showground Rd to Olympic Blvd
Drawn Fraser Ave from Olympic Blvd to Edwin Flack Ave
For more information call 9714 7300 or email enquiries@sopa.nsw.gov.au